Category Archives: Ridge Route Preservation Organization

Ridge Route Preservation Organization Needs Your Help!

The Ridge Route Preservation Organization needs your help! They have posted a video on their Clean Up The Ridge Route project and are looking for volunteers! Check out their website – https://ridgeroute.org and the video for more details.

Ridge Route February 2024 Update Video

In early and mid-February 2024, the Ridge Route Preservation Organization went on a field survey trip over the Ridge Route to assess damage. They took a lot of videos and put together an overview of what they saw.

Come join the Ridge Route Preservation Organization on their journey over the Ridge Route.

New History Video

The Historic Highway 99 Association of California is starting a new series on the history of US 99, historic sites along the way, and information about the Association. Join them on their YouTube Channel – @highway99 – to learn more. Their first video is on The Grapevine.

Historic Highway 99 Association of California YouTube Channel

Ridge Route Preservation Organization Begins Pothole Project

From the Ridge Route Preservation Organization:

The Ridge Route Preservation Organization was cleared by the Angeles National Forest to repair potholes along the north section of the Old Ridge Route from the 138 to the Tumble Inn.

The intent is to preserve the road and make it more accessible to the public as well as emergency services. Filling the potholes can reinforce crumbling sections of the road as well as prevent further damage to the original road surface.

The Ridge Route Pothole Project will begin in spring of 2024.

These improvements don’t only serve to protect the history of the Ridge Route, the repairs will also serve everyone who passes through the area. It’s a large stretch of open land that provides recreation for hikers, cyclists and hunters as well as being a heavy fire danger area. It’s important that emergency vehicles have quick and easy access when mere seconds matter.

A donation of $15 buys a 50 pound bag of asphalt cold patch.

For volunteer and donation info visit https://ridgeroute.org/pothole-project.

Ridge Route Work Event – May 20, 2023

Event announcement from the Ridge Route Preservation Organization. Please go to their website to sign up and get additional information.

We are planning our first CUTRR – Clean Up The Ridge Route â€“ event to be held on May 20, 2023. The road has suffered through a lot this winter and it needs your help! Our work will concentrate on clearing drains of debris on the northern end between the Tumble Inn and Reservoir Summit. Due to conditions, we won’t be able to go over the entire roadway afterward as we have done in the past. Additionally, lower clearance vehicles are not recommended on the Ridge Route at this time.

Please RSVP so we can get a rough headcount before the event. We look forward to seeing you all out there!

For additional information on our CUTRR events:

CUTRR – Clean Up The Ridge Route

Clothing Requirements:

Please be in sturdy shoes, pants, and shirt. Hats and protective glasses are recommended depending on what work you’ll be performing.

Tools Needed:

Bring whatever tools you have to cut branches and clear debris. Supplies such as picks, shovels, rakes, pruning saws, pole pruners, mattocks, clippers, wheelbarrows, brooms, and other items may also be needed.

Meeting Location:

We will be meeting at the Gorman Carl’s Jr, 49669 Gorman Post Rd, Gorman, CA 93243, at 0800 hrs on May 20, 2023 and will be leaving by 0830 hrs.