Built: 1940
Type: Concrete Continuous Tee Beam
Length: 104′
This bridge was built by the Works Projects Administration and will be replaced in the near future.
Built: 1940
Type: Concrete Continuous Tee Beam
Length: 104′
This bridge was built by the Works Projects Administration and will be replaced in the near future.